New Roofs & Roof Replacement in Dublin

Wondering whether another repair is still worth paying for? We look at the condition of your existing roof first: the covering, fixings, accessible layers and earlier repairs. Only then do we explain whether a repair, a defined section of renewal or a full re-roof makes sense.

Emergency: 083 158 8431

Emergency roofing is available 24/7, 365 days a year. Call to check current availability. Same-day attendance depends on location, weather, traffic, crew availability and safe access; it is not guaranteed.

Call 01 727 0010

Tell us about the roof

What's been happening, which part of the house, and any earlier repairs. Email is optional; a description is enough and photos are optional.

Emergency roofing: 083 158 8431

When renewal is worth considering

Replacement starts to make sense when the problems are spread across the roof rather than sitting in one repairable detail. Typical evidence includes deterioration across large areas of the covering, fixings failing in several places, accessible underlay or supporting layers in poor condition, and faults that keep returning in different spots after local repairs.

Age on its own doesn't decide it. Neither does one slipped slate, one cracked tile or one ceiling stain. An older roof may still be suitable for repair where the retained covering and details are sound. We explain which way the evidence points and what still needs assessment.

If you're dealing with a specific fault, start with roof repairs.

Where water is getting in and the source is unclear, see roof leak detection.

For a longer comparison, read roof repair vs replacement.

Local repair, a renewed section or a full re-roof

These are three different scopes, and the quotation should make clear which one you're being offered and what it does and doesn't put right.

A partial renewal is not automatically better value than repairs, and a full re-roof is not automatically better value than a partial one. It depends on how much of the roof is genuinely deteriorating, how well the retained parts will perform beside new work, and how often you'd otherwise be calling someone out. Where more than one option is reasonable, we price them separately so you can compare.

  • Local repair: puts right a defined defect, such as a run of slipped slates, a damaged ridge or a failed flashing. Everything else is retained. It suits a roof that is otherwise sound, and can flag areas needing further assessment later.
  • Renewal of a defined section: one slope, a rear return or an area around a chimney is stripped and recovered. The rest is retained, so the new work has to join retained details that are sound and compatible. That joint is part of the scope, not an afterthought.
  • Full re-roof: the agreed coverings come off the whole roof and it is rebuilt from the approved supporting layers up. It deals with widespread deterioration in one programme rather than piecemeal.

Slate, fibre-cement or tile

Options for an existing Dublin roof include natural slate, fibre-cement slate, concrete tiles and clay tiles. They differ in profile, weight, minimum pitch, fixing method and how they meet ridges, verges and valleys. Changing from one to another, or matching a retained roof next door, needs checking against your roof's pitch, its supporting structure, the extra or reduced loading and the fixings required.

We compare suitable coverings against those requirements, as well as the finish you're looking for. The quotation names the proposed material and specification so you can compare like with like, rather than relying on a broad description such as new slates or new tiles.

For natural and fibre-cement slate, see slate roofing.

For concrete and clay profiles, see tile roofing.

What sits beneath the covering

Under the slates or tiles there is underlay, battens and the fixings that hold everything on. Depending on the roof, relevant timber, insulation and ventilation can also come into it. A new covering laid over tired supporting layers won't fix everything, and a ventilation or insulation issue isn't solved by changing the slates.

That doesn't mean every hidden component is replaced automatically. Some of it can only be judged properly with closer professional access, or after agreed opening-up of a test area. We tell you which parts we've seen, which we're assuming, and what we'd need to check before confirming the scope.

Ridges, verges, valleys and other junctions

Much of the work in a re-roof is at the edges and junctions: the ridge and hips, the verges at the gables, valleys between slopes, flashings at chimneys and walls, and the weathering around rooflights. These are also where new work connects to anything being retained, so they need planning as carefully as the main slopes.

Work to the chimney masonry, the gutters and downpipes, fascias, or replacing a roof window is separate work. It's included only where we've agreed it and listed it in the quotation.

For junction work, see lead flashing and valley repairs.

For stacks, pots and flaunching, see chimney repairs.

For rainwater runs, see guttering.

For boards at the eaves, see fascias and soffits.

For roof windows, see skylight installation and repair.

Existing flat sections on the same house

An existing extension, porch, dormer or garage roof may need a different scope from the pitched roof beside it. Repair, refurbishment or renewal depends on the membrane, deck, insulation, drainage and compatibility with retained layers.

We assess wet or unsound layers before adding more waterproofing. Preparation and the selected system's moisture requirements matter; a coating is not an automatic remedy for a deteriorated build-up. The quotation identifies the flat section separately so it is clear whether it is included in the proposed work.

For membranes and decks, see flat roofing.

For care between repairs, read flat roof maintenance in Ireland.

Working on a home you're living in

Before work starts we discuss how the house will be used during the job. We plan suitable professional access, including scaffolding where needed, and ask about side passages, rear access, lower extensions and conservatories. The access plan must account for what lies below the work rather than assuming it can support people or materials. We also agree material storage and waste handling.

Tell us which rooms are in daily use under the work and which routes need to stay clear. We explain likely restrictions and sequence the work with the weather, including temporary protection where needed. The expected programme allows for access, conditions and findings once coverings are removed; it is not a promise of uninterrupted indoor use or a fixed completion date.

How an agreed full replacement runs

Once the scope is agreed in writing, a full replacement usually follows this order:

Removing the covering is not permission to replace every exposed item. We record the parts being retained, explain concealed findings and agree any additional work and cost before it goes ahead.

  1. Confirm the scope, access arrangements and materials in writing.
  2. Set up access and protection for the house and garden.
  3. Remove the agreed coverings, and only those.
  4. Inspect what's exposed, including battens, underlay and visible timber.
  5. If concealed damage or work outside the scope is found, pause the affected work, explain and price the findings, and obtain approval before additional work, maintaining necessary temporary protection.
  6. Complete the approved supporting layers.
  7. Lay the new covering.
  8. Form the ridges, hips, verges, valleys and flashings, and the connections to retained parts.
  9. Check the drainage and complete finishing checks.
  10. Remove waste and hand over, going through what was done.

What the written quotation sets out

The free written quotation reflects the evidence from the assessment and, where it's realistic, the repair alternative. It covers:

  • The roof areas included and what we found on each.
  • The specified covering and the supporting layers being renewed.
  • Ridge, hip, verge, valley, flashing and other junction details.
  • Access, scaffolding where needed, and protection of the house and garden.
  • Removal of agreed materials and waste disposal.
  • Inclusions, exclusions and the items being retained.
  • Any known timber or deck work, kept separate from contingency for what may be concealed.
  • How concealed findings are shown to you and approved before extra work.
  • The expected programme and the written terms.

To request one, use the form above or our contact page.

Warranty and aftercare

Full roof replacements and new roofs carry a 10-year warranty, with the scope and terms set out in writing for the agreed work. Partial renewals and local repairs have their own applicable written terms; the full-replacement warranty duration does not extend to those jobs.

At handover we go through what was completed against the agreed scope: the renewed and retained parts, relevant finish and drainage checks, and anything outstanding. If fresh wetness or another symptom appears afterwards, contact us with the room, dates and weather at the time so we can discuss reassessment. Drying marks and new water need distinguishing; a stain alone does not establish the cause. A description is enough. Photos are optional and only from a safe indoor position; don't climb or enter an unsafe space to investigate.

For ongoing checks, see roof maintenance and inspections.

Local guidance across Dublin

We're based in Blanchardstown and serve Dublin. These existing local guides explain replacement of failing roofs on existing homes; the specification and access arrangements still depend on the individual property:

For an existing home in Dublin 15, see new roofs and re-roofing in Blanchardstown.

For Castleknock enquiries, see new roofs and re-roofing in Castleknock.

For Malahide enquiries, see new roofs and re-roofing in Malahide.

For Rathfarnham enquiries, see new roofs and re-roofing in Rathfarnham.

For Terenure enquiries, see new roofs and re-roofing in Terenure.

Elsewhere, see roofing across Dublin.

Making your enquiry

Tell us in ordinary words what's been happening: leaks, slipped slates, repeated call-outs, or just a roof you're unsure about. You don't need to diagnose it, know the material, or send photos. Use the form or ring 01 727 0010. If water is coming in now or material is loose, ring 083 158 8431 instead.

For urgent problems, see emergency roof repairs.

Roof replacement FAQs

How do I know if I need a new roof or just a repair?

It depends on how widespread the problems are. Deterioration across large areas, failing fixings in several places or faults that keep coming back point towards renewal. A single defect, or the roof's age alone, doesn't. We assess first and explain which way the evidence points.

See roof repair vs replacement.

Can you replace just part of the roof?

Yes, where the rest is sound. A defined section such as one slope can be renewed, provided the new work joins retained details that are sound and compatible. That joint is set out in the quotation.

Is a full re-roof better value than repairs?

Not automatically. It depends on how much of the roof is deteriorating and how often you'd otherwise need repairs. Where more than one option is reasonable, we price them separately.

Can I change from tiles to slate, or the other way round?

Possibly. It needs checking against the pitch, supporting structure, loading, fixings and detailing, not just appearance. We discuss it before the scope is agreed.

Can my existing slates or tiles be reused?

Sometimes, if their condition and specification allow. Reuse is agreed after assessment, and the quotation says how the scope changes if they turn out unsuitable once lifted.

Will the underlay and battens be replaced?

On a full re-roof the agreed supporting layers are renewed as set out in the quotation. On partial work it depends on condition. We don't replace hidden components automatically; the scope says what's included.

What happens if you find rotten timber after stripping?

We stop, show you what we found, explain the work and price it, and only continue with your approval.

Can we stay in the house during the work?

It depends on the scope, the areas affected and safe access. We discuss how the house will be used, which rooms and routes need to remain available, and any restrictions before work starts.

What happens if it rains during the work?

Work is sequenced around the weather, and open sections are protected temporarily. We can't promise dry weather, so the programme may move.

How long will a re-roof take?

That depends on the agreed scope, access and weather. The quotation gives an expected programme rather than a fixed completion date.

Are the chimney, gutters and roof windows included?

Only where agreed and listed in the quotation. It identifies the roof junctions being renewed; chimney masonry, gutters and roof-window work are not automatically included.

See chimney repairs.

Can you give me a price over the phone?

You can describe the problem by phone, but a reliable written replacement quotation needs assessment of the areas, materials, access and condition. We provide that quotation free and explain any inspection limits or concealed-work contingencies.

What affects the cost?

Mainly the roof size and shape, the covering chosen, the supporting layers being renewed, the number of junctions, access and scaffolding, protection needs and waste removal.

Is there a warranty on a new roof?

Full replacements and new roofs carry a 10-year warranty, with the scope and terms in writing. Partial renewals and local repairs have their own written terms for the work done.

What should I do if I notice something after the work?

Tell us the room, the dates and the weather at the time. A description is enough; photos are optional and only from a safe position indoors.

Can you renew the flat roof on an existing extension or garage?

Yes, we can assess it for repair, refurbishment or renewal. The membrane, deck, insulation, drainage and compatibility of retained layers inform the choice. It is identified separately in the quote rather than assumed to be included with the main roof.

See existing flat-roof repair and renewal options.